图书介绍
美标名词术语定义选编 中英对照【2025|PDF|Epub|mobi|kindle电子书版本百度云盘下载】

- 著
- 出版社:
- ISBN:
- 出版时间:未知
- 标注页数:168页
- 文件大小:3MB
- 文件页数:189页
- 主题词:
PDF下载
下载说明
美标名词术语定义选编 中英对照PDF格式电子书版下载
下载的文件为RAR压缩包。需要使用解压软件进行解压得到PDF格式图书。建议使用BT下载工具Free Download Manager进行下载,简称FDM(免费,没有广告,支持多平台)。本站资源全部打包为BT种子。所以需要使用专业的BT下载软件进行下载。如BitComet qBittorrent uTorrent等BT下载工具。迅雷目前由于本站不是热门资源。不推荐使用!后期资源热门了。安装了迅雷也可以迅雷进行下载!
(文件页数 要大于 标注页数,上中下等多册电子书除外)
注意:本站所有压缩包均有解压码: 点击下载压缩包解压工具
图书目录
Agency,Federal1
CONTENTS1
A1
Activity1
Agent1
Agency,Assigned1
Advanced Development2
Activity,Lead Service2
Airframe Structure2
Assignee2
Activity,Participating3
Applicant3
Acceptance Trials3
Activity,Review3
Aerospace Vehicle4
Activity,Preparing4
Activity,Military Coordinating4
Aerospace Vehicle Equipment4
Availability5
Activity,User5
Activity,Assignee5
Application5
Appendixes6
Assembly6
Accessary6
Attachment6
Acquisition7
Aerospace Ground Equipment7
Acceptance Tests8
Acceptance Test Environments8
Acceptable Quality Level9
Aggravated test9
Aging,Undistorted,Accelerated9
Achieved Availability10
Accessibility10
Acquisition Management System Control Number10
Acceptance Number10
Aging,Artificial11
Acquisition Management Systems and Data11
Requirement Control Iist11
Administractive Data11
Averange Outgoing Quality12
Adaptive Contol System12
Ambinet Vibration12
Artificial Environment12
Average Outgoing Quality Limit12
Airfield,Heavy-Load13
Average Sample Size Curve13
Attribute13
Administrative and Logistic Delay Time13
Apportioned Unit Cost13
Airfield,Forward-Aera(Base)14
Airfield,Light-Load14
Airfield,Rear_Area(Base)15
Airfield,Zone of Interior(Base)15
Applied Meteorology15
Airfield,Theater_of_Operations(Base)16
Applied Shock16
Airfield,Support_Area(Base)17
Airfield,Expeditionary(Base)17
Applied Climatology18
Airfield,Medium Load(Base)18
Aero,Light VTOL Landing18
Atmospheric19
Applied Environmental Research19
Atmospheric Optics19
Atmospheric phenomenon20
Black Recording21
B21
Backup21
Background21
Background Count21
Baseline22
Bias22
Burst22
Burn-in23
Burst Pressure23
Brake Control System23
Contract24
Bomb Gear24
Bump Tester24
C24
Configuration Control25
Configuration25
Configuration Itemn25
Contract Data Requiremants List26
Configuration Management26
Configuration Identification26
Critical Item26
Calibration26
Configuration Status Accounting27
Checkout27
Criticality Analysis27
Contractor27
Classified Information28
Certificate of Conformance28
Commercial Products28
Custodian28
Categories of Contractors29
Commercial Data29
Common Group Items30
Coordinated Procurement30
Contract Quality Requirements30
Compatative Tests30
Crash Safety31
Classification of Defects31
Commonality31
Corrosion,Destructive32
Critical Defective32
Corrosion,Electro-chemical32
Corrosion,Fretting32
Corrosion,Test33
Corrosion,Underfilm33
Corrosion,Crevice33
Corrosion,Galvanic33
Corrosion,Fatigue Limit33
Cooling,Regenerative34
Cold Dry34
Cold Wet34
Component(1)35
Cooling,Film35
Cold Soak35
Cycling35
Cycling Logarithmic35
Coordination36
Component(2)36
Comment,Essential36
Comment,Suggested37
Cycling,Linear37
Cycle37
Critical Design Review37
Corrosion,Intergranular38
Class38
Common Purchasing Agreement38
Cycling,Log-Log38
Central Air Data Computer39
Corrosion,Stress39
Corrosion,Coefficient of39
Corrosion,Preventien39
Chamber,Altitude40
Chamber,Humidity40
Chamber High Temperature40
Chamber,Accelerate Weathering41
Chamber,Salt Spray41
Chamber,Clean41
Chamber,Reverberant41
Compatibility42
Chamber,Salar Radiation42
Chamber,Temperature42
Circuit Reliability42
Compatibility,Intra-system Electromagnetic43
Communications Survivability44
Computer,True Airspeed44
Composite44
Computer,Rotation Go-Round45
Compliance45
Computer,Altitude45
Computer,Flight Director45
Command and Control System Equipment45
Critical Energy46
Computer,Letdown,Vertical/Navigation46
Computer,Logic and Monitor46
Coupling Agent46
Criticality46
Clearance Number47
Critical Defect47
Critical Temperature47
Creep47
CIP_Cast_In_Place48
Crack Propagation Resistance48
Climatization48
Climatic Test48
Casualty Criteria49
Chemical Tempering49
Contact Molding49
Cloud_Chamber Effect49
Development Monitor50
Chemical Agent,Phosgene50
D50
Department,Participating50
DoD AMSDL Clearance Office50
Development51
Distributor51
Dimensional Stability51
Dependability51
Development Specification52
Development Test and Evaluation52
Damage mode52
De_Bugging52
Demonstration52
Design Allowables52
Data Item Description53
Detail Specification53
DoD Component53
Data Source54
Direct Maintenance Man Hours per Maintenance Action54
Data Product54
Data Transfer Rate54
Damage Tolerance55
Duration,Shutdown55
Data Terminal Equipment55
Data Subscriber Terminal Equipment55
Durability56
Drop Test56
Development Test56
Downing Event56
Deviation57
Detection-correction System57
Drop Test57
Depot Maintenance58
Defective58
Dynamic Load58
Deficiencies59
Defects-Per-Hundred-Units59
Deterioration59
Deterioration Resistance60
Depot/Shipyards60
Damage Effects60
Defect60
Degradation60
Environmental Research61
Deterioration-Resistance Products61
E61
Environmental Engineering61
Environmental Factor62
Environmental Field Test62
Environmental Control62
Environmental Design Criteria62
Environmental Lapse Rate63
Environmental Test63
Environmental operational63
Environmental operating Conditions63
Electromagnetic Compatibility64
Electromagnetic Environment64
Environmental Resistance Feature64
Evironmental Suitability of a Product64
Engineering Management65
Engineering Development65
Engineering Development(Service Test)65
Engineering Change Proposal65
Examination66
Engineering Practices66
Failure Mode67
End Item67
EX Number67
F67
First Article Inspection67
Failure Cause68
Failure68
Faiure,Dependent69
Failure Analysis69
Failure Mode and Effects Analysis(FMEA)69
Failure,Critical69
Faiure Random69
Failure,Catastrophic69
Failure Rate70
Failure,Independent70
Failure,Intermittent70
Failure,Non-Chargeable70
Failure,Non-Relevent70
Fail-Safe Device71
Failure Effect71
Failure Mechanism71
Fault71
Fault Isolation71
Fail-Safe Operation71
Fail-Safe Design71
Facility Equipment72
Eacilities Design Criteria72
Facilities72
Flight Essential Functions73
Flight Test73
Fligit Test Vehicle73
Flight Regime73
Fragility Factor74
Flexible Item74
Fragile74
Feedback Control System75
Fastening System75
Forcing Function75
Feedback75
Free Rocket76
Feedback Control Loop76
Functional Configuration Identification76
Inspection77
Formal Qualification Review77
Functional Configuration Audit77
I77
Inspection by Variables78
Inspection,Original78
Inspection Level78
Inspection by Attributes78
Inspection,Quality Conformance78
Interchangeable Item79
Inspection,In-process79
Inspection,Tightened79
Inspection,Cyclical79
Inspection Record79
Item79
Item Standardization Codes80
Item of Supply80
Item Reduction Study80
Industry Group80
Interfaces81
Initial Quality81
Indenture Level82
Interference82
Intermediate Maintenance82
Inside Plant83
Initial Indenture Level83
Interoperability83
Induced Environment84
Intelligibility84
Industrial Packaging84
Intermediate Pack84
Item,Standard85
Information Transfer85
Interface Desigh Specification85
Inherent R M Value85
Kill Probability86
J86
Jan Brand86
K86
Lot(Materials)87
L87
Lot87
Lot(Electronic Part)87
Life Profile88
Lot Size88
Lot Formation88
Life Units88
Life Cycle History88
Limiting Quality89
Long Lead Time Items89
Line Replaceable Unit89
Live Room89
Limited Application part89
Laminate90
Limited Coordination Military Specification90
Lead Service90
Long Life Container90
Maintenance,Preventive91
Lattice Imperfection91
M91
Maintenance,Corrective92
Maintenance Event92
Maintainability,Mission92
Mission Profile92
Maintenance,Scheduled93
Maintainability93
Maintenance Action93
Maintenance Time93
Major Defect94
Mean-Time-To-Service(MTTS)94
Mean-Time-To-Restore System(MTTRS)94
Mean-Time-Between-Maintenance(MTBM)94
Minor Defect94
Mean Active Maintenance Downtime(MAMDT)95
Minor Defective95
Major Defective95
Mean Time Between Maintenance Inherent(MTBM Inherent)95
Mean Time Between Maintenance Induced(MTBM Induced)95
Mean Time Between Preventive Maintenance(MTBPM)96
Mean Time Between Maintenance No Defect(MTBM NO Defect)96
Mean-Time-To-Failure(MTTF)97
Material Review Board97
Maintenance,Manning Level97
Mean-Time-Between-Removals(MTBR)97
Mission-Time-To-Restore-Functions(MTTRF)98
Mean-Time-Between-Failure98
Mean-Time-Between-Demands(MTBD)98
Mean-Time-To-Repair(MTTR)98
Maintainability Design99
Mean-Time-Between-Maintenance Actions(MTBMA)99
Mean-Time-Between-Downing-Events(MTBDE)99
Mission-Time-Between-Critical-Failure(MTBCF)99
Maintenance Quality Assurance100
Maintenance Concept100
Maintenance Coneept Impact100
Maintainability Model100
Mission Profile101
Manufacturing Baseline101
Military Speci fication101
Military Bulletin102
Maintenance Task102
Maintenance Ground Equipment102
Maintenance Task Distribution102
Mode of Vibration,Normal103
Military Parts Control Advisory Group103
Measuring and Test Equipment104
Modes,Coupled,Modes of Vibration104
Mode,Resonant104
Mode of Vibration104
Mean Daily Maximum Temperature104
Mean Hourly Temperature104
Microcircuit Module105
Management Data105
Marginal Testing105
Module105
Monomeric Cement106
Mark and MOD Nomenclature106
Modification Number106
Mark Number106
Monomer106
Multiapplication Containers107
Masking107
Noise Randoom108
N108
Normal Inspection108
Nonconformance108
Noncritical Items108
Noise Critical,Alternate109
Noise Background109
Noise,White109
Noise-concelling109
National Coordinating Activity110
National Qualification110
Operational Availability(AO)111
O111
Operating Cha racteristic Curves111
One Hundred percent Inspection111
Objective QualityEvidence111
Off Equipment Maintenance112
Organizational Maintenance112
Operating Life112
Overhaul Cycle112
Operating Ground Equipment113
Operational R M Value113
Operational Readiness113
Oporational Test and Evaluation113
Overshoot114
Operational Environment114
Off-The-Shelf Item114
Operational Support114
Pre-Award Survey115
Overshoot Factor115
Other Indenture Level115
Office of Primary Responsibility(OPR)115
P115
Prevent Failure116
Probability of Acceptance116
Process average116
Product Quality Review116
Produt Defective116
Preventive Maintenance116
Primary Damage Mechanism117
Percentage of Failure Rate117
Proof Test117
Pot Life117
Periodic Inspection117
Production Lead Time117
Producer118
Primary Damage Effects118
Product118
Preparing Activity(PA)119
Procuring Activity119
Procuring Agent/Agency119
Program Plan120
Proposed PPSL120
Program120
Program Analysis120
Producibilitv121
Personnel Subsystem121
Parts Control Board(PCB)121
Privately Developed Item121
Production Feasibility121
Preliminary Design Review122
Production Engineering122
Product Specification123
Physical Configuration Audit(PCA)123
Patch(Low Level Language)123
Part123
Program,Stop123
Preproduction(Prototype)124
Program Manager124
Pragram Design Specification124
Program Performance Specification124
Platform Environment125
Production125
Production Readiness Review(PRR)125
Prototype Pack125
Plasticizer126
Program Parts Selection List(PPSL)126
Pressure,Recovered126
Pressure Tendency126
Quality Conformance Inspection127
Q127
Quality127
Quality Assurance(QA)127
Quality Control(QC)127
Qualification127
Quality Program Requirement128
Quality Assurance Representative(QAR)128
Qualified Product128
Qualified Product List128
Quantitative Testing129
Qualification Test129
Reliability Assurance130
R130
Reliability130
Replaceable Unit130
Replaceable Module130
Reduced Capability Mode131
Repair Survival Rate(RSR)131
Retrofit131
Random Sample131
Reduced Inspection131
Reiection Number131
Redudance,Standby132
Remote-Handling System132
Reusable Container132
Returnable Empty132
Redundancy132
Redundant132
Specification133
Response,Spurious133
Response,Standard133
Reproducibility133
S133
Standardization133
Standardization Directory(SD_1)134
Standard134
Standardization Documents134
Standardization Project134
Selective Application and Tailoring135
Standardization Accomplishment Report135
System Spccification135
Supplier Surveillance136
Stratification Code136
Statement of Intent136
Supplier136
Sampling Frequency(f)137
Subcontractor137
Style137
Sample137
Sample Unit137
Sample Size137
Sample Plan137
Sampling Plan,Multi_Level,Continuous138
Sampling Plan,Single138
Sampling Plan,Double138
Sampling Plan,Multiple138
Sampling Plan,Single_Level,Continuous138
Standard Sample139
Sampling Plan,Sequential139
Sampling,Biased139
Specimen139
Secondary Damage Mechanism140
Specification Change Notice(SCN)140
Survey,Product Oriented140
Screening Inspection140
Substitute Item141
System141
Subsystem141
Subassembly141
Support Equipment(SE)142
System Segment142
Service142
Set143
Selective Group Items143
Special Group Items143
Standard part143
Support144
Storage Life144
Software Enhancement Proposal(SEP)145
Software Support,Activity145
Software Trouble Reports(STR)145
Software Change Proposals(SCP)145
Software Error145
State-of-the-Ground Code146
Survivability146
Susceptibility146
Single-Fail Operative146
Shaker,Electromagnetic147
Shaker,Electrodynamic147
Shaker,Direct Drive147
Shaker,Piezoelectric147
System Design Review148
Sensible Temperature148
Shieded Enclosure148
Shielding148
System Engineering Process148
Standard Part,Material or Process(PMP)149
System Requirements Review149
Star Fracture150
Source Document150
Stress Endurance Limit150
Soak150
Spalling150
Storage Quality Control151
Sag Forming151
Strain Point151
Solvent Cement151
Sample Repersentative151
Superseded Document151
Testing152
T152
Test Provisions152
Test Diserepancy152
Test Facility153
Test Specification153
Threshold153
Time,up153
Technical Data154
Technical Program Planning and Control154
Tape Dump155
Types of Load155
Transportability Problem Item155
Time,Mission155
Time,Modification156
Time,Alert156
Time,Delay156
Time,Checkout156
Time,Not Operating156
Time,Inactive156
Time,Administrative156
Time,Turn Around157
Time,Active157
Time,up(Uptim)157
Time,Reaction157
Test and Maintenance157
Type Designation,158
Trainer158
Test,Endurance158
Test,Environmental Simulation158
Test Point158
Thermal Tempering159
Type159
Test specimen159
Test Language159
Unification Meeting160
Thermpplstic160
Thermosetting160
Thermopla stic160
U160
Unscheduled Maintenance161
Universal Document Number161
Useful Life161
Unit of Produet161
Uptime Ratio161
Utilization Equipm ent162
Unit Pack162
Virtual Temperature163
V163
Verification163
Validation163
Vehicle Loading Configuration164
Virtual Pressure164
Visibility Chart164
Vulnerability164
Weapon System Software165
W165
Weapon System166
Wearout167
Work Area167
Work Station167
Working Environment167
Waiver168
Wearout Life168
Working Group168
热门推荐
- 2387279.html
- 2379627.html
- 1918769.html
- 2090027.html
- 1131646.html
- 549588.html
- 1164027.html
- 2891712.html
- 2032071.html
- 214604.html
- http://www.ickdjs.cc/book_1003491.html
- http://www.ickdjs.cc/book_3004449.html
- http://www.ickdjs.cc/book_2701311.html
- http://www.ickdjs.cc/book_287973.html
- http://www.ickdjs.cc/book_677684.html
- http://www.ickdjs.cc/book_3033980.html
- http://www.ickdjs.cc/book_2292399.html
- http://www.ickdjs.cc/book_1256288.html
- http://www.ickdjs.cc/book_3040182.html
- http://www.ickdjs.cc/book_703898.html